Irwin-Simpson Road Improvements

 
Project Overview


Irwin-Simpson Road did not line up at Wilkens Blvd and so the traffic flow had to utilize Wilkens Blvd. to continue on Irwin-Simpson Road. The realignment project has been developed and underway to realign 1400 feet of Irwin-Simpson Road from Nottingham Way to Polo Drive at a cost of $1,980,050.98. Part of the plan is for a portion of the existing Irwin-Simpson Road west of Wilkens Blvd. to be abandoned and a cul-de-sac 350 feet west of Wilkens Blvd. to be constructed. The new Irwin-Simpson Road and Wilkens Blvd. intersection will be signalized. The project is funded by a Deerfield Township TIF. The design consultant on the project is American Structurepoint and the construction contract has been awarded to Mt. Pleasant Blacktop, Inc. in September 2009. Construction, having already begun, will continue until completion in June of this year.


Project Updates


April 12, 2010
The project began in the fall of 2009. At the time, Irwin-Simpson Road did not line up at Wilkens Boulevard and so the traffic flow had to utilize Wilkens Boulevard to continue on Irwin-Simpson Road. The project was undertaken to realign 1400 feet of Irwin-Simpson Road from Nottingham Way to Polo Drive at a cost of $1,980,050.98. Part of the plan is for a portion of the existing Irwin-Simpson Road west of Wilkens Boulevard to be abandoned and a cul-de-sac 350 feet west of Wilkens Boulevard to be constructed.

May 4, 2010
The Irwin-Simpson Road Relocation Project is still underway. Improvements in traffic flow are being developed. Please be on alert for changes in signaling and signage.

Starting Friday, May 7, 2010, what was originally the intersection of Deerfield Boulevard, Wilkens Boulevard, and Irwin-Simpson Road will open as the intersection of Deerfield Boulevard and Wilkens Boulevard. The intersection will also differ beginning Monday, May 10, 2010 in that it will be a 2-way stop instead of the 4-way stop it originally was. Wilkens Boulevard will no longer have stop signs, while Deerfield Boulevard will.

Construction begins Monday, May 10, 2010 to join the leg of Irwin-Simpson Road west of Wilkens Boulevard with the Irwin-Simpson Road leg east of Wilkens Boulevard. This construction will require a full closure west of Wilkens Boulevard to Nottingham Way that will last for four weeks. After construction, traffic will no longer utilize Wilkens Boulevard as a connector.

This newly developed intersection of Irwin-Simpson Road and Wilkens Boulevard will be a four-way signalized intersection. Starting Friday, May 7, 2010 the new traffic signals for this intersection will be turned on and set to blink red and then be a fully-functioning traffic signal on Monday, May 10, 2010.

The detour for the portion of construction beginning on Monday May 10, 2010 will continue to utilize Snider Road, Socialville-Fosters Road, and Wilkens Boulevard. Thank you in advance for your patience.


Groundbreaking - Phase 1

On October 6, 2009 at noon was the groundbreaking for the 1st phase of the Irwin-Simpson Road Improvements. The improvements are now underway and Phase 1 is scheduled to be complete in July 2010. Phase 2 is only in the development phase.



left to right -- Bill Becker, Deerfield TWP Interim Administrator; Kurt Weber, Warren County Chief Deputy Engineer; Steve Bosse, Robert C. Rhein Interests, Inc.; Larry Weis, Warren County Sheriff; Pete Patterson, Deerfield TWP Trustee; Dan Corey, Deerfield TWP Trustee; Chris Romano, Deerfield TWP Trustee; John Wahle, Deerfield TWP Fiscal Officer.




Comment Summary - Public Involvement Meeting - August 6, 2008

  Read a summary of comments received from citizens in attendance at
  the Irwin-Simpson Road Improvements Public Involvement Meeting held
  August 6, 2008. Based on public comment, several changes have been
  incorporated into the proposed improvement to Irwin-Simpson Road.

            Comment Summary





August 6, 2008 - Public Meeting Displays

The following are the displays presented at the Public Meeting held on August 6, 2008 at the Deerfield Township Trustee Meeting Room in Mason, Ohio:

Phase 1
 Typical Section
 Rendering

 West of Nottingham Way to West of Polo Drive
 East of Nottingham Way to East of Wilkens Blvd.

Phase 2
 Typical Section
 Rendering

 Butler-Warren Road to East of Charleston Park Drive
 West of Snider Road to East of Nottingham Way


 Informational Sheet - August 6, 2008
 PI Meeting Comment Sheet - to be mailed by August 20, 2008

For additional information regarding the project please contact the Warren County Engineer's Office at (513) 695-3301.



back to current projects page