Bridge #26-2.35 is in need of replacement as the existing concrete slab bridge is deteriorating. The existing bridge will be replaced by force
account with a multi plate pipe arch. The project cost estimate is $70,000 and will be funded by the Warren County Engineer. Construction is scheduled for the spring of 2019. The bridge is located on Cozaddale-Murdoch Road just southeast of Dallasburg Road in Hamilton Township.